SDLC blueprint

V-Model — ceremonies (prescriptive)

The V-Model's ceremonies center on **design reviews** (left-side gates) and **test reviews** (right-side gates). Each V-level has corresponding ceremonies.

V-Model — ceremonies (prescriptive)

The V-Model's ceremonies center on design reviews (left-side gates) and test reviews (right-side gates). Each V-level has corresponding ceremonies.


1. Requirements review

Intent: C1 + C2.

Inputs Draft requirements, stakeholder needs, constraints, regulatory obligations
Outputs Approved requirements baseline; acceptance test strategy agreed
Participants Systems engineer (R), test manager (R), sponsor (R), PM (R)
Timebox Half day to 2 days (scales with complexity)

Agenda:

  1. Walk through requirements for completeness, testability, and traceability.
  2. Identify ambiguities and conflicts.
  3. Agree on acceptance criteria and high-level test approach.
  4. Baseline the requirements document.

2. System design review

Intent: C2 + C4.

Inputs System design document, interface specifications, requirements traceability
Outputs Approved design baseline; system test plan inputs
Participants Systems engineer (R), test manager (R), dev team (R), PM (O)
Timebox 2–4 hours

3. Detailed design review

Intent: C2 + C4.

Inputs Module-level design, algorithms, data structures, integration interfaces
Outputs Approved detailed design; integration test plan inputs; unit test strategy
Participants Dev team (R), systems engineer (R), test manager (O)
Timebox 1–2 hours per module group

4. Test plan review (per V-level)

Intent: C2 + C6.

Inputs Test plan for the specific V-level, traceability matrix, test environment plan
Outputs Approved test plan; environment readiness criteria
Participants Test manager (R), IV&V (R where applicable), systems engineer (R), PM (O)
Timebox 1–2 hours

Prescriptive rule: Review the traceability — every requirement should map to at least one test case. Flag untested requirements explicitly.


5. Test readiness review (TRR)

Intent: C4 + C6.

Inputs Test plan, test environment, test data, build under test, entry criteria
Outputs Go / hold decision for test execution
Participants Test manager (R), dev team (R), PM (R), IV&V (O)
Timebox 1–2 hours

6. Test result review (per V-level)

Intent: C4.

Inputs Test execution results, defect reports, coverage metrics
Outputs Pass / fail / conditional pass; defect resolution plan
Participants Test manager (R), systems engineer (R), IV&V (R where applicable), PM (R)
Timebox 1–2 hours

7. Acceptance review

Intent: C4 + C1 (closure).

Inputs Acceptance test results, traceability matrix (complete), compliance evidence
Outputs Formal acceptance or rejection; deployment authorization
Participants Sponsor (R, decision), systems engineer (R), test manager (R), PM (R), IV&V (R where applicable)
Timebox 2–4 hours

8. Development sync (during implementation)

Intent: C3.

Inputs Implementation status, integration issues, environment problems
Outputs Coordination decisions, blocked items escalated
Participants Dev team (R), systems engineer (O), PM (O)
Timebox 15–30 min (daily or as needed)

9. Quick I/O summary

Ceremony Primary output
Requirements review Approved requirements baseline
System design review Approved design baseline
Detailed design review Approved module designs
Test plan review Approved test plans with traceability
TRR Go / hold for testing
Test result review Pass / fail with defect plan
Acceptance review Formal acceptance; deployment authorization
Dev sync Coordination, unblocked items

Canonical source

Edit https://github.com/autowww/blueprints/blob/main/sdlc/methodologies/v-model/ceremonies-prescriptive.md first; regenerate with docs/build-handbook.py.