V-Model ceremonies → ceremony foundation
**Purpose:** Map **V-Model** design reviews and test gates to methodology-neutral **intent types** in [`ceremony-foundation.md`](ceremony-foundation.md).
V-Model ceremonies → ceremony foundation
Purpose: Map V-Model design reviews and test gates to methodology-neutral intent types in Ceremony foundation (methodology-neutral).
Canonical V-Model narrative: https://forgesdlc.com/methodologies-v-model.html · Wikipedia — V-model
Note: The V-Model's ceremonies center on left-side reviews (design gates) and right-side reviews (test gates). Below maps typical practices.
Practices / meetings × intent types
| Common practice | Foundation intents (primary → secondary) | Notes |
|---|---|---|
| Requirements review | C1 Align → C2 Commit | Baseline requirements; agree acceptance approach. Top of the V. |
| Design review (system + detailed) | C2 Commit → C4 Inspect | Approve design; confirm testability and traceability. |
| Test plan review | C2 Commit → C6 Assure | Approve test strategy, traceability matrix, environment plan per V-level. |
| Development sync | C3 Sync | Coordination during implementation phase (bottom of V). |
| Test readiness review (TRR) | C6 Assure → C4 Inspect | Gate: is the build and environment ready for testing at this V-level? |
| Test result review | C4 Inspect | Evaluate test outcomes; decide pass/fail/conditional at each V-level. |
| Acceptance review | C4 Inspect → C1 Align | Formal acceptance at top-right of V; deployment authorization. |
C5 (Improve) in the V-Model is typically a post-project activity (lessons learned, process audit). Better teams add mid-cycle retrospectives during long development phases.
Tracking
Requirements traceability matrix (RTM) is the primary tracking artifact. It links requirements → design elements → test cases → test results across all V-levels. Maintain in docs/requirements/traceability/ or your ALM tool.
Suggestions (V-Model-specific)
| Practice | Suggestions |
|---|---|
| Requirements review | Verify testability of each requirement. Vague requirements produce vague tests. |
| Design review | Check traceability: does each design element map to a requirement? Does the corresponding test plan exist? |
| Test plan review | Flag untested requirements explicitly. 100% coverage is the target; waivers must be documented. |
| TRR | Do not proceed if the test environment does not match production configuration (where applicable). |
| Test result review | Classify failures by V-level: a unit test failure is different from a system test failure in root cause and fix. |
| Acceptance | Base acceptance on evidence (traceability, test results, compliance), not on opinions or partial demos. |
Crosswalk to other methodologies: Methodology bridge — foundation intents ↔ named ceremonies.