Process slots — SDD I/O (cross-methodology)

**Purpose:** **Spec-driven development** view of **named process slices** that appear under many methodologies (Scrum, Kanban, XP, phased). Each slot is **not** a calendar title—it is a **reusable I/O

Process slots — SDD I/O (cross-methodology)

Purpose: Spec-driven development view of named process slices that appear under many methodologies (Scrum, Kanban, XP, phased). Each slot is not a calendar title—it is a reusable I/O contract you can attach to your own ceremonies or gates.

Template: PROCESS SLOT (template)

Handbook: Process (SDD I/O)

Maps to intents: Each slot lists C1–C6 touch for traceability to Ceremony foundation (methodology-neutral).


P1 — Backlog refinement (options → ready)

Field Value
sdd_id SDD-P1-REFINEMENT
kind process_slot
maps_to.ceremony_intents C1 (partial), C2 prep
maps_to.sdlc_phases A, B

Summary

Increase transparency and readiness of top backlog items before commitment—without yet pulling into a timebox.

Preconditions

ID Artifact Example
PRE-P1-1 Ranked options exist Top 15 epics/stories in order
PRE-P1-2 Definition of Ready documented Team wiki §DoR

Inputs

ID Name Example (snippet)
IN-P1-1 Raw story drafts “As a user I want offline…”
IN-P1-2 Tech constraints “SQLite only; max 50MB cache”

Outputs

ID Name Consumer Example
OUT-P1-1 Sized / clarified stories Planning AC bullets + mock link in story.md
OUT-P1-2 Explicit “not ready” flags Demand “M2E4S1 blocked on legal — label blocked

Postconditions

  • [ ] Next planning can name items that meet DoR.
  • [ ] Estimates or t-shirt size recorded where team policy requires.

Filled example

Refined M2E1S3: AC added (3 Gherkin scenarios); spike closed on encryption; marked ready; still too large — split to M2E1S3a/b in WBS.


P2 — Planning / commit slice

| sdd_id | SDD-P2-PLANNING | maps_to | C2 (often + C1 tail) |

Summary

Select work for next execution boundary and record forecast vs capacity.

Preconditions

ID Ready when example
PRE-P2-1 DoR-met items ≥ team’s typical pull
PRE-P2-2 Capacity known (PTO, holidays)

Inputs

Example
Ordered backlog, velocity/cycle data, dependency board

Outputs

Example
Sprint/iteration goal string; committed IDs in tracker; deferred list with reasons

Filled example

Sprint 14: goal “Ship conflict modal”; committed M2E1S2, M2E1S3a; deferred M2E1S3b (capacity); recorded in Linear + WBS.md.


P3 — Daily execution sync (micro-loop)

| sdd_id | SDD-P3-DAILY | maps_to | C3 |

Summary

24h inspect-and-adapt toward current goal; unblock or escalate.

Inputs

Example
Board state, CI status, “yesterday/today” per active work unit

Outputs

Example
Owner on each blocker; adjusted task order; optional note in standup channel linking issue #

Filled example

Blocker: emulator crash — @devB pairs with @devA 2h; PO notified if S2 slips to next day; board updated 10:05.


P4 — Stakeholder inspection (demo / review)

| sdd_id | SDD-P4-INSPECT | maps_to | C4 |

Summary

Working increment vs acceptance; structured feedback to backlog.

Preconditions

Example
Environment reachable; AC published; known defects listed

Outputs

Example
Signed-off AC table; new stories with IDs; meeting notes path

Filled example

M2E1S1 AC met; M2E1S2 AC3 → new M2E6S1; notes …/notes/2026-01-22-demo.md.


P5 — Release candidate assurance

| sdd_id | SDD-P5-RC | maps_to | C6 |

Summary

Prove release readiness: tests, checks, sign-offs, artifact immutability.

Inputs

Example
RC build id, test report, dependency audit, privacy checklist

Outputs

Example
Go/no-go; CHANGELOG; tag; store listing draft

Filled example

RC 1.4.0-rc2: UI tests 142/142; Steer go; tag pushed; Play Store bundle …aab hash logged in release/M2.md.


P6 — Phase / gate decision (phased delivery)

| sdd_id | SDD-P6-GATE | kind | process_slot | gate_or_continuous | gate |

Summary

Formal exit from stage N to N+1 with evidence pack and steering decision.

Preconditions

ID Example
PRE-P6-1 Exit criteria checklist for stage
PRE-P6-2 Gate pack assembled (design refs, test summary, risks)

Inputs

Example
Baseline IDs, CR impact if any, audit log excerpts

Outputs

Example
Signed gate record; updated baseline version; “hold” actions with owners

Approvals (typical)

Approver Evidence Record
Sponsor / Steer Exit criteria matrix gates/G3-approve-2026-02-01.pdf or signed wiki

Filled example

Design stage exit: TRR checklist green; one CR approved → rebaselined SRS v1.3; gate approve logged; build stage start date set.


Using with agents / engineers / product

Role Use SDD slots to…
Product Ensure OUT-* rows land in backlog/docs before next C2.
Engineers Tie commits/PRs to IN/OUT work-unit IDs; reject PRs missing trace row.
Agents Read Preconditions + Inputs as prompt context; write Outputs only to named paths in spec.

Copy any slot into your repo via PROCESS SLOT (template) and specialize.

Canonical source

Edit https://github.com/autowww/blueprints/blob/main/sdlc/methodologies/spec-driven/process-slots-sdd.md first; regenerate with docs/build-handbook.py.